Autor Wiadomość
px215467
PostWysłany: Czw 9:40, 02 Gru 2010    Temat postu: p90x workout schedule Imbalance of power on the bu

Imbalance of power on the bus


The reason is the power to the load measuring device with an integrated error is not caused by the match. In order to meet the bus power imbalance ≤ 1, from (12) and (13) derived Σ (A) Σ (A) ≤ 0.01. Σ (A) If Σ (A) a Σ (A)> o 1J】 is a good (I () ≤ f). 01. Σ (A) (1-0.01) Σ (A) ≤ Σ (A) i-I = 19 (≤ jet (A ...) If Σ (A) is Σ (Am) Σ Σ (,p90x workout schedule,) 1 to be ineligible. from the measured parameters marked in Figure 4 can be seen, the power A and B integrated error of measurement line load line measurement of relative changes of the magnitude of error of less comprehensive. Therefore, the application (16) to adjust the load line Comprehensive measurement error, to meet the bus for the power imbalance that clarity ≤ 1, with the number line to represent. it \, A a 2J (A.) A 514000 (kw ・ h) ● Table 1 and monthly measurement device with the measured error power situation in B-nan】】 circle circle circle I poked circle circle f l d substation bus metering circle bearing in mind that parameters marked B-Σ (): 506590 (kW.h) J = IC = 0.99A = 50886o (kW ・ hD = 1.01A a 519l40 (kW.h) b 5O659: O. ..] B ~ 'a 50886O -. ・ 1l made a 5l40o0 ------- relatively small number of changes. The first section Ⅳ Comprehensive error of measurement line is equal to zero when the battery is 179200 = X (1-1.2) X - 181376.5 (kW ・ h) when the power increased to 179200 +2270-181470 (kw.h) when the integrated error of measurement is 181470 = 181376.5 (1 + W) W a 0.052 meter error shall be transferred to a 0.052 +0.8 Wb a 0852% error therefore transferred to 0.852 meter, to meet the bus power imbalance Island ≤ 1. z.) 3 Results Cambodian language results in Figure 5 Figure 5 shows the results calculated, Ad with a 2270 as long as a number between ~ 12,tory burch shoes,550, bus power of the imbalance can meet the requirements, together with 7410,mbt shoes, a bus power of the imbalance O. should also take into account the error of energy meters,mbt sandalen, if added to the excessive power on the meter, the meter may cause tolerance. Therefore, the combined The power meter should not exceed the maximum limit is causing the error 90. Otherwise, the remaining capacity should be added to the other line up. for the results of this fall. In, in the A maximum of a 179,200,UGG Australian, plus 2270 and its Detection of bus power balance work carried out is very important. through a comprehensive error detection measurement device can improve the accuracy of measurement, which is return loss assessment and economic operation is essential. (Received Date 19960513)
More articles related to topics:


mbt schuhe auslaufmodelle Gas water heater thermal

UGG Boots Main Auxiliary Power Transmission option

uggs sale How to promote the Campus Network _1944

Powered by phpBB © 2001, 2005 phpBB Group